I went to Harrisonburg HS so I still try to keep tabs the Valley schools
as much as possible. I get why the School Board decided to build East Rock (supposed to have been huge growth from a new development). At the same time I was still surprised the School Board didn't wait until the development, which I believe ended up not happening, was already built or at least half way built before deciding to build a new County HS.
|
(
In response to this post by mtnrun)
Posted: 07/17/2019 at 4:10PM